AQL Chart

All guides

  • Agreeing an AQL with your supplier: what buyers usually settle before production

    Explains which points buyers and suppliers commonly agree in writing before production, so that an AQL-based inspection result is less likely to be argued over later.

  • AQL 1.0 and 1.5: sample sizes and accept/reject numbers by lot size

    Sample sizes and accept/reject numbers for AQL 1.0 and AQL 1.5 at general inspection levels I, II and III, by lot size, from the normal-inspection single sampling plans of MIL-STD-105E.

  • AQL 4.0: sample sizes and accept/reject numbers by lot size

    AQL 4.0 sample sizes and Ac/Re numbers at general inspection levels I, II and III for all fifteen lot-size ranges, from MIL-STD-105E Table II-A.

  • AQL inspection levels: code letters for General I, II, III and Special S-1 to S-4

    Full Table I of MIL-STD-105E in one grid: every lot-size range from 2 to 8 up to 500,001 and over against S-1 to S-4, I, II and III, with the sample size that belongs to each code letter from A to R.

  • AQL sample size chart for General Level II: every lot size against the common AQLs

    This page gives General Level II sample sizes and Ac/Re acceptance numbers for every lot-size range at AQL 0.65 to 6.5, taken from MIL-STD-105E Table II-A.

  • Common mistakes when reading an AQL table

    This article lists the slips readers commonly make when reading an AQL table and shows the correct reading from the table rows.

  • General Level I versus Level II: how the sample size changes at AQL 2.5

    A lot-by-lot table comparing general inspection levels I and II at AQL 2.5, giving the code letter and the sample size with Ac and Re that each level uses.

  • How AQL appears in an inspection report

    Explains which AQL entries an inspection report usually carries and how to check them against a sampling table.

  • How to choose an inspection level: I, II, III and S-1 to S-4

    What the seven inspection levels do, in the words of the sampling standard: level II is the normal one, I and III trade discrimination for sample size, and S-1 to S-4 keep samples small at a higher risk.

  • How to read an AQL table, step by step

    Reading an AQL table in three steps: lot size and inspection level to a code letter, code letter and AQL to a sample size with Ac and Re, and what to do when you land on an arrow.

  • What AQL 2.5 means, with the numbers from the table

    AQL 2.5 read from the table: the sample size, acceptance number and rejection number for every lot size at general inspection level II, and what the 2.5 does and does not promise.

  • What is AQL? The definition in the sampling standard

    What AQL means in acceptance sampling, read from the definition in MIL-STD-105E: a limit on the process average over a series of lots, not a promise about any single lot.

  • When the sample size equals or exceeds the lot: the 100 percent inspection footnote

    The Table II-A footnote calls for 100 percent inspection when the sample size equals or exceeds the lot, and at general inspection level II this happens in nine lot-size and AQL combinations.

AQL Chart Guide