All guides
- Agreeing an AQL with your supplier: what buyers usually settle before production
Explains which points buyers and suppliers commonly agree in writing before production, so that an AQL-based inspection result is less likely to be argued over later.
- AQL 1.0 and 1.5: sample sizes and accept/reject numbers by lot size
Sample sizes and accept/reject numbers for AQL 1.0 and AQL 1.5 at general inspection levels I, II and III, by lot size, from the normal-inspection single sampling plans of MIL-STD-105E.
- AQL 4.0: sample sizes and accept/reject numbers by lot size
AQL 4.0 sample sizes and Ac/Re numbers at general inspection levels I, II and III for all fifteen lot-size ranges, from MIL-STD-105E Table II-A.
- AQL inspection levels: code letters for General I, II, III and Special S-1 to S-4
Full Table I of MIL-STD-105E in one grid: every lot-size range from 2 to 8 up to 500,001 and over against S-1 to S-4, I, II and III, with the sample size that belongs to each code letter from A to R.
- AQL sample size chart for General Level II: every lot size against the common AQLs
This page gives General Level II sample sizes and Ac/Re acceptance numbers for every lot-size range at AQL 0.65 to 6.5, taken from MIL-STD-105E Table II-A.
- Common mistakes when reading an AQL table
This article lists the slips readers commonly make when reading an AQL table and shows the correct reading from the table rows.
- General Level I versus Level II: how the sample size changes at AQL 2.5
A lot-by-lot table comparing general inspection levels I and II at AQL 2.5, giving the code letter and the sample size with Ac and Re that each level uses.
- How AQL appears in an inspection report
Explains which AQL entries an inspection report usually carries and how to check them against a sampling table.
- How to choose an inspection level: I, II, III and S-1 to S-4
What the seven inspection levels do, in the words of the sampling standard: level II is the normal one, I and III trade discrimination for sample size, and S-1 to S-4 keep samples small at a higher risk.
- How to read an AQL table, step by step
Reading an AQL table in three steps: lot size and inspection level to a code letter, code letter and AQL to a sample size with Ac and Re, and what to do when you land on an arrow.
- What AQL 2.5 means, with the numbers from the table
AQL 2.5 read from the table: the sample size, acceptance number and rejection number for every lot size at general inspection level II, and what the 2.5 does and does not promise.
- What is AQL? The definition in the sampling standard
What AQL means in acceptance sampling, read from the definition in MIL-STD-105E: a limit on the process average over a series of lots, not a promise about any single lot.
- When the sample size equals or exceeds the lot: the 100 percent inspection footnote
The Table II-A footnote calls for 100 percent inspection when the sample size equals or exceeds the lot, and at general inspection level II this happens in nine lot-size and AQL combinations.